KENT, Conn.—After more than two-and-one-half hours of detailed testimony, the Inland Wetlands Commission (IWC) this week continued a public hearing on a proposed 80-unit housing development until Monday, Dec. 14, at 7 p.m.

The plan would see construction of 14 structures on a 12.5-acre meadow adjacent to Town Hall. Twenty percent—16 apartments—would be designated as affordable housing, a much-needed addition in a town where, through this September, the 12-month median sale price for a single-family home was $846,500. Dozens of working families are waiting on affordable housing lists.
The IWC session was the third time that developer Jim Millstein, managing member of Kent Housing Development Associates, had brought his plan before the commission. The plan has faced implacable opposition from intervenor Bonnie Bevans, a neighboring property owner, as well as others.
Before opening the session, IWC Chairman Lynn Werner advised listeners that the IWC is constrained legally to consideration of wetlands and watercourses. “We cannot consider destruction of protected wildlife habitat, town sewer, traffic patterns, aquifers or ground water,” she stated.
Nor, she added, can the IWC determine whether another town or state agency is doing its job properly. “All discussion has to pertain to the legal scope of this commission,” she said.
Nevertheless, she did not interrupt Bevans while the intervenor listed 17 points that concern her, including the effects of the development on the aquifer, the possible presence of wildlife species listed as being of concern, the possible failings of the town’s antiquated sewer system, gridlock from increased traffic generated by the development, the need to expand culverts under the railroad tracks and Route 341, the need to expand Maple Street Ext. to accommodate traffic, zoning restrictions on the number of apartments in the multi-family units, and the height of the buildings.
Zoning Enforcement Officer Tai Kern had advised the IWC in previous meetings that the intervenor has the same legal status as the applicant and carries the burden of proving significant environmental harm would result from the development, just as the developer must demonstrate the validity of his proposal.
Bevans cited regulatory sources but did not present specific evidence to support her assertions of harm. Instead, she “respectfully requested” that the applicant or town agencies do such things as:
- Identify exactly what vegetation will be disturbed, how native planting will be established, what performance measures apply, who maintains it, how invasives will be controlled and what happens if restoration fails.
- Identify on engineering plans where the construction channels would be for each photograph she submitted and compare the photographs with both the applicant’s field survey and the IWC’s third-party reviewer’s observations.
- Detail plans for site supervision, contractor instructions, work timing, habitat protection and monitoring.
- Produce a site scale overlay showing where this parcel lies relative to drinking water well contribution areas together with measured seasonal groundwater elevations and proposed infiltration systems.
- Have an independent review as to whether added sewage from the 80 homes would affect groundwater-connected wetlands, water courses and nearby wells.
- Procure an independent study of whether the added wastewater would affect groundwater, nearby wetlands or water courses.
- Have an independent verification of dissolved chloride in groundwater, including snow storage and overflow routes.
- Submit an exact account of access acres of soil to be disturbed, the planned construction start date, the type of state permit required, the latest filing status and the storm water pollution control plan if required.
- Get a qualified field investigation and mapped locations of vernal pools, the adjacent wooded hillside drainage features, their seasonal hydro period and potential effects from grading and storm water systems.
- Decide whether there is a feasible alternative to the location.
- Have a railroad and DOT consultation and a map drainage analysis on Maple Street Ext. and the railroad crossing.
- Have the relevant town and city authorities estimate whether roadway and drainage work will be needed at Maple Street Ext., downstream culvert improvements or expansion of the wastewater capacity and identify which costs the developer must legally bear.
“This could be done a lot smaller,” she said. “If Mr. Millstein has this large heart, let him build 20 or 30 houses and make them all affordable. Give them porches, give them garages, give us parking for the Town of Kent. If he is such a great guy, protect our resources. We are a destination, and if we end up having gridlock coming into Kent, no one is going to want to come here. We can take our ugly houses, our dilapidated buildings and turn them into something beautiful and protect out wetlands.”
The session opened with a presentation by Millstein’s design team, including project manager Dainius L. Virbickas, P.E., a civil engineer and principal at Artel Engineering Group, LLC, who conducted soil testing on the site and developed the proposed stormwater management plan; soil scientist Jim McManus, who determined the extent of wetlands, and landscape architect Abigail Adams, who has created an extensive landscape design.
Virbickas described the tract of land as gently sloping north to south, with a manmade drainage ditch or watercourse conveying runoff across the meadow toward culverts in the south. He said it is not located within the boundaries of town’s aquifer protection overlay map and has well-drained soils.
Building would occur on the north end of the tract with about five acres of open space being reserved to the south where ponding during storm events makes development difficult. Kent Green Boulevard, which currently ends at Town Hall, would be extended through the development with an exit onto Route 341.
Verbickas described points at which the developers would cross the water course—a vehicular passage over a boxed concrete—or if required, an open-bottom culvert—and small pedestrian bridges. A “healthy amount” of sidewalks is included in the plan to encourage pedestrian traffic, and passive recreation would provided by mown pathways through the remaining open space. The meadow would be seeded with wildflower mixtures appropriate to the soil types and hundreds of trees and shrubs would be planted.
Verbickus reported that potable water would be drawn from Aquarion Water Company. Aquarion is conducting flow tests to give an accurate accounting of its ability to provide service. “Our preliminary discussion indicates there is more than enough capacity,” Verbickas reported.
Sewage would be accepted by the town’s sewer plant. In a separate interview this week, Sewer Commission Chairman Elissa Potts said the plant currently has the capacity to accept the estimated 26,000 daily gallons of effluent the development is expected to produce.
Potts said the commission’s current permit has been extended and is not expired, as repeatedly stated by project opponents. She is working with the Department of Environmental Protection to determine the future of the plant and expects to know in four to six months what needs to be done to upgrade it.
Currently, the plant, which superintendent Lyle Sommers reports to be operating at high levels of efficiency, is receiving daily volumes approximately 80,000 gallons less than it is rated for by the state.
Verbickas said Environment One Corporation (E/One) has designed a low-pressure sewer system for sanitary discharges. “Each building will have its own pumping station below ground, interconnected with a low-pressure receiving line directed toward an existing manhole at the south end of property,” he said.
The manhole was installed previously in anticipation of developing the land, which the Planning and Zoning Commission designated as a incentive zone for housing about a decade ago.
Soil testing on the site was conducted in March and again in July, with similar results. Based on their findings, the Millstein team developed a stormwater management plan to help retain and infiltrate runoff from impervious surfaces such as paving and roofs.
Verbickas noted that the team has received comments from LandTech Consultants, an independent engineering company retained by the IWC, that call for further testing using a different method than that employed by Kent Housing Development.
In his presentation, LandTech lead engineer Robert Pryor agreed that the site offers highly drainable sands and gravels but said that facilitates the rapid movement of stormwater through it with little treatment of the water.
“This would be a concern if you were considering that roof runoff could have airborne deposited nitrogen and phosphorous,” he said. “We have asked them to justify how their design meets stormwater quality requirements.”
The Millstein team used the Turf Tec Double-ring Infiltrometer test apparatus to measure infiltration, a system Pryor said is “not particularly suitable for sand and gravel” as it tends to overestimate infiltration rates for gravelly soil.
“We’ve asked the applicant to do a different type of test to evaluate the infiltration capacity of the soils,” he said. “Some of the testing needs to go deeper to actually verify that there’s no restrictive layers beneath the several underground detention systems they are proposing. We asked them to evaluate those depths.”
Verbickas said the plan would intercept water from the adjacent wooded hillside and Kent Green, routing it southward to a stormwater retention basin capable of impounding runoff from one to 100-year-storm floods. On the west side of the property, basins would infiltrate and manage waters.
But Pryor wanted further data on the amount of water that might flow through the ditch from surrounding lands, saying the applicant’s evaluation omitted a “significant aspect of the channel, which is the flow that enters from the north upstream sources.”
“By our estimation, there’s approximately 200 acres of land that drains into that channel from the north,” Pryor said. “That stormwater drainage would create anywhere from 80 to 120 cfs (cubic feet per second) of flow entering the water course, depending on storm events varying from a 25-year storm to a 100-year storm. We suggested that the applicant evaluate that because they’re modifying the channel.”
He noted that the lower areas in the south act as temporary storm water reservoirs and said he didn’t see an adequately modeled stormwater management calculation.
And if the boxed concrete culvert is changed to an open-bottom culvert, LandTech would would like the hydraulics to be re-evaluated and possible armoring of the channel.
Pryor said he did not see these considerations to be “deal-killers.”
Bevans urged that Millstein be held responsible for waters flowing off the land through culverts under the railroad tracks and Route 341. Flooding already occurs on town property near the town garage and South Commons Park.
Verbickas referred to the team’s storm drainage document as “about 4 inches thick” but said further attention would be given to LandTech’s “modifications as may be necessary.”
Millstein’s soil scientist James McManus said he found no wetlands on the site. “There is really one resource on site, the drainage ditch, but there are no wetlands associated with the watercourse.”
His conclusion was supported by LandTech’s senior biologist Tom Ryder who reported the meadow has been used for agriculture or as a meadow since 1934, with the “channelized swale” [ditch] having been installed between 1979 and 1986. He said regional soil scientist Anthony Zumba confirmed there are no other wetlands on the property.
McManus responded to a video submitted by Julianne Dow, another neighboring property owner, showing flooding in the southern portion of the tract. She asserted there could be another watercourse as evidenced by the northward flow of the water.
“Wetlands are based on soil types,” McManus said. “I can see from your expression that you disagree, but because water ponds for an hour or so does not mean it’s wetland. It takes many, many, many hundreds of years to develop wetlands. You have to look at soils and make determinations. This just a regulated ditch water course.”
He said the apparent northward flow was occasioned by flood waters moving into a lower elevation on the field.
Ryder said he saw no indications of vernal pools. “In order to be vernal, you have to have a defined depression, he said. “I saw no defined depression, nor anything that would allow for standing water [long enough] to allow complete metamorphosis for any of the obligate vernal pool species.”
Bevans wanted a “reconciliation” of the developer’s and the third-party reviewer’s description of the channel as “perennial” or “intermittent.” Both agencies agreed the channel could be described either way. “They are not regulated any differently,” Ryder said. “It doesn’t really change anything.”
Where Pryor did disagree with the developer’s plan was with the flood flow alteration and shoreline stabilization along the channel. “If water does overflow the bank, there is no defined flood plain for it to be held in place,” he said. “It’s fine to put in plantings, but I don’t feel they will function for those two attributes.”
LandTech engineers agreed with Millstein’s team that sloping back the ditch’s banks to allow planting and slightly widening its bed for 400 to 600 linear feet “will provide a benefit to the watercourse.”
The planting plan is “sound,” LandTech engineers said, but added they saw no provisions for monitoring or controlling re-establishment of invasive species. They believe, however, that the area where invasives are to be removed is small enough to discourage regrowth.
But LandTech wanted more details about the use of stabilization mats and provisions to prevent erosion if a storm should occur before the plantings take hold.


Is it possible to do phased housing project?? Start with 40 units. There should be at least 15 affordable housing units. Then reevaluate once those units are built and operable. The town of Kent should consider all options.